14 NOTICE! Protect the injector hole from dirt.
Remove 88880011 Broach.
Remove 88800014 Rotation tool.
15 Install the injector; refer to Injector,
Change page 183.
16 Fill with coolant; refer to 26-0, Coolant Level,
Checking and Topping Up.
17 Start the engine. Perform a function check.
P0020950
23-7 Injectors and Delivery Pipes
7747622 12-2014 © AB VOLVO PENTA 195

دیزل ژنراتور | ماشین های راهسازی | لودر | بیل مکانیکی | لیفتراک | موتور پمپ | پمپ آب